01Trois-Rivières, QC · tier 2 market

Low-rise office building cost in Trois-Rivières

A two to six storey office shell delivered to base-building standard: core, envelope, elevators and primary mechanical, with tenant space left open. Base building and tenant fit-out are separate budgets and should never be blended into one rate.

02The curated band

Hard cost, standard spec

$315/sf

Band $252 – $395

All-in, preset build

$476/sf

60,000 sf, 4 storey

Hard share of all-in

75%

Rest is soft cost, charges, contingency, escalation

QC escalation

3.5%/yr

Quarter ending 2025-09-30

Buildlor Construction Cost Index · Last updated 2026-01-15 · Maintained by Buildlor Cost Desk

Scope: Trois-Rivières, Quebec — Low-rise office building

Inputs: Altus Group Canadian Cost Guide 2025, Toronto base range; Statistics Canada Building Construction Price Index, table 18-10-0135-01

Next scheduled review: 2026-04-15

03Build the stack

Your build

All-in cost — Office (low-rise), Trois-Rivières

$28,584,192

$476/sf · band $22,539,958$36,409,317

At this specification the office (low-rise) prices at about $476 per square foot all-in, with a 49% spread between the low and high band. Hard cost is 75% of the total and everything above it is soft cost, charges, contingency and escalation.

Cost stack by line
LineAmount$/sf
Substructure and foundations$2,349,648$39/sf
Structure and frame$4,699,296$78/sf
Envelope, roofing and glazing$3,524,472$59/sf
Interior partitions and finishes$2,741,256$46/sf
Mechanical and plumbing$3,132,864$52/sf
Electrical and life safety$2,153,844$36/sf
General conditions and fee$979,020$16/sf
Site work and servicing$1,762,236$29/sf
Hard cost subtotal$21,342,636$356/sf
Design and consultants$1,536,670$26/sf
Permits, approvals and reviews$384,167$6/sf
Project management and testing$768,335$13/sf
Financing, insurance and legal$1,152,502$19/sf
Contingency (10%)$2,518,431$42/sf
Escalation to midpoint (12 mo)$881,451$15/sf
All-in cost$28,584,192$476/sf

How these figures were produced

  • ObservedRecorded directly from the cited source series, unadjusted.
  • ModelledDerived arithmetically from observed inputs using the published method; not a market quote.
How Buildlor computes these numbers

Carry this deal forward

Your numbers travel with the link

The deal is encoded in the URL, never stored. Open a sister utility and it arrives pre-filled.

Keep this deal under watch

Save the deal and Dealor re-runs it every month against current rates and your own dates — so you hear about a broken DSCR or a lapsing renewal before your lender does.

Dealor — soon

04What moves the number

Cost drivers for this type in Trois-Rivières

Glazing ratio

a fully glazed curtain wall can double envelope cost against a punched-window precast facade.

Floor plate efficiency

a small plate spreads core, elevator and stair cost across less rentable area.

Parking

structured or underground parking is a separate cost per stall and often exceeds the building rate per square foot.

Base building versus fit-out

the shell rate assumes no tenant partitions, so price the fit-out separately.

Trois-Rivières' industrial work is dominated by conversion of former pulp and paper facilities. That is why the same drawings priced in Trois-Rivières and in Toronto do not land at the same number even when the trades are the same.

On the preset build above, hard cost is $21,342,636 and everything after it — soft cost, charges, contingency and escalation — adds $7,241,556. Budgeting off a hard rate alone is the single most common way an early construction budget goes wrong.

Buildlor facts

  • Hard cost for a office (low-rise) in Trois-Rivières sits at $315 per square foot at standard specification.
  • Soft cost at 18% of hard adds $3,841,674 to the preset build.
  • QC construction escalation is running at 3.5% a year, or $881,451 over twelve months on this build.

05Related

Other types in Trois-Rivières

All markets →

06Questions

What does it cost to build a office (low-rise) in Trois-Rivières?

On the curated Trois-Rivières band, hard cost runs $252 to $395 per square foot for a office (low-rise) at standard specification. Adding site work, soft cost, charges, contingency and twelve months of escalation puts the all-in figure near $476 per square foot on a 60,000 sf preset. Your own area and specification change that number, which is what the builder above is for.

Why does Trois-Rivières price where it does?

Trois-Rivières' industrial work is dominated by conversion of former pulp and paper facilities. The published Toronto base range is scaled by a documented factor of 0.84 for this market, and the QC escalation series is running at 3.5 percent a year.

Is the development charge in this number?

No. We do not yet hold a charge row for Trois-Rivières. Enter the figure from the municipality's schedule in the builder.

What is excluded from every figure here?

Land, financing interest during construction beyond the soft-cost allowance, taxes recoverable as input credits, tenant furniture and equipment, and any remediation or off-site works. Those are separate line items in a real proforma.

07Sources

Sources

  1. [1] Altus Group Canadian Cost Guide 2025, Toronto base rangePublished Toronto range scaled by a documented city cost factor of 0.84. Hard cost only: excludes land, soft costs, development charges and contingency.
  2. [2] Statistics Canada Building Construction Price Index, table 18-10-0135-01Non-residential building construction, Montreal CMA.
How Buildlor computes these numbers

Not adviceBuildlor is a data publisher. We do not bid, price, estimate, or build work, and nothing here is a quote, a tender price, or construction advice. Figures are indicative order-of-magnitude benchmarks for early budgeting and must be confirmed by a qualified cost consultant, quantity surveyor, or general contractor before you rely on them. About Buildlor