A single-storey multi-bay retail shell delivered in grey-box condition with demised units, stubbed services and a storefront. Parking, servicing and landscaping carry an unusually large share of the total on a retail pad.

02The curated band

Hard cost, standard spec

$271/sf

Band $219 – $342

All-in, preset build

$409/sf

20,000 sf, 1 storey

Hard share of all-in

77%

Rest is soft cost, charges, contingency, escalation

ON escalation

3.2%/yr

Quarter ending 2025-09-30

Buildlor Construction Cost Index · Last updated 2026-01-15 · Maintained by Buildlor Cost Desk

Scope: Ottawa, Ontario — Retail strip and plaza shell

Inputs: Altus Group Canadian Cost Guide 2025, Toronto base range; Statistics Canada Building Construction Price Index, table 18-10-0135-01

Next scheduled review: 2026-04-15

03Build the stack

Your build

All-in cost — Retail strip, Ottawa

$8,778,677

$439/sf · band $7,093,008$11,103,999

At this specification the retail strip prices at about $439 per square foot all-in, with a 46% spread between the low and high band. Hard cost is 72% of the total and everything above it is soft cost, charges, contingency and escalation.

Cost stack by line
LineAmount$/sf
Substructure and foundations$650,400$33/sf
Structure and frame$1,300,800$65/sf
Envelope, roofing and glazing$975,600$49/sf
Interior partitions and finishes$758,800$38/sf
Mechanical and plumbing$867,200$43/sf
Electrical and life safety$596,200$30/sf
General conditions and fee$271,000$14/sf
Site work and servicing$867,200$43/sf
Hard cost subtotal$6,287,200$314/sf
Design and consultants$377,232$19/sf
Permits, approvals and reviews$94,308$5/sf
Project management and testing$188,616$9/sf
Financing, insurance and legal$282,924$14/sf
Development charges and levies$540,000$27/sf
Contingency (10%)$777,028$39/sf
Escalation to midpoint (12 mo)$231,369$12/sf
All-in cost$8,778,677$439/sf

How these figures were produced

  • ObservedRecorded directly from the cited source series, unadjusted.
  • ModelledDerived arithmetically from observed inputs using the published method; not a market quote.
How Buildlor computes these numbers

Carry this deal forward

Your numbers travel with the link

The deal is encoded in the URL, never stored. Open a sister utility and it arrives pre-filled.

Keep this deal under watch

Save the deal and Dealor re-runs it every month against current rates and your own dates — so you hear about a broken DSCR or a lapsing renewal before your lender does.

Dealor — soon

04What moves the number

Cost drivers for this type in Ottawa

Site work share

surface parking, curbs and landscaping frequently exceed 15 percent of hard cost on a plaza.

Demising and metering

more units means more party walls, more services and more meters per square foot.

Storefront glazing linear footage, not area, drives the envelope cost.

Storefront glazing linear footage, not area, drives the envelope cost.

Restaurant-capable bays need grease exhaust and heavier services designed in from day one.

Restaurant-capable bays need grease exhaust and heavier services designed in from day one.

Federal tenant fit-outs set the quality benchmark in Ottawa, pulling office TI budgets above the provincial average. That is why the same drawings priced in Ottawa and in Toronto do not land at the same number even when the trades are the same.

On the preset build above, hard cost is $6,287,200 and everything after it — soft cost, charges, contingency and escalation — adds $1,897,477. Budgeting off a hard rate alone is the single most common way an early construction budget goes wrong.

Buildlor facts

  • Hard cost for a retail strip in Ottawa sits at $271 per square foot at standard specification.
  • Soft cost at 15% of hard adds $943,080 to the preset build.
  • ON construction escalation is running at 3.2% a year, or $231,369 over twelve months on this build.

05Related

Other types in Ottawa

All markets →

06Questions

What does it cost to build a retail strip in Ottawa?

On the curated Ottawa band, hard cost runs $219 to $342 per square foot for a retail strip at standard specification. Adding site work, soft cost, charges, contingency and twelve months of escalation puts the all-in figure near $409 per square foot on a 20,000 sf preset. Your own area and specification change that number, which is what the builder above is for.

Why does Ottawa price where it does?

Federal tenant fit-outs set the quality benchmark in Ottawa, pulling office TI budgets above the provincial average. The published Toronto base range is scaled by a documented factor of 0.95 for this market, and the ON escalation series is running at 3.2 percent a year.

Is the development charge in this number?

Not by default. We hold a baseline estimate for Ottawa but it is not yet verified against the bylaw, so the builder starts it at zero and labels it. Enter your own figure from the municipality.

What is excluded from every figure here?

Land, financing interest during construction beyond the soft-cost allowance, taxes recoverable as input credits, tenant furniture and equipment, and any remediation or off-site works. Those are separate line items in a real proforma.

07Sources

Sources

  1. [1] Altus Group Canadian Cost Guide 2025, Toronto base rangePublished Toronto range scaled by a documented city cost factor of 0.95. Hard cost only: excludes land, soft costs, development charges and contingency.
  2. [2] Statistics Canada Building Construction Price Index, table 18-10-0135-01Non-residential building construction, Toronto CMA.
  3. [3] City of Ottawa Development Charges By-law 2024-166Baseline seed awaiting bylaw verification; excluded from the default stack.
How Buildlor computes these numbers

Not adviceBuildlor is a data publisher. We do not bid, price, estimate, or build work, and nothing here is a quote, a tender price, or construction advice. Figures are indicative order-of-magnitude benchmarks for early budgeting and must be confirmed by a qualified cost consultant, quantity surveyor, or general contractor before you rely on them. About Buildlor