01Barrie, ON · tier 2 market

Low-rise office building cost in Barrie

A two to six storey office shell delivered to base-building standard: core, envelope, elevators and primary mechanical, with tenant space left open. Base building and tenant fit-out are separate budgets and should never be blended into one rate.

02The curated band

Hard cost, standard spec

$345/sf

Band $276 – $432

All-in, preset build

$520/sf

60,000 sf, 4 storey

Hard share of all-in

75%

Rest is soft cost, charges, contingency, escalation

ON escalation

3.2%/yr

Quarter ending 2025-09-30

Buildlor Construction Cost Index · Last updated 2026-01-15 · Maintained by Buildlor Cost Desk

Scope: Barrie, Ontario — Low-rise office building

Inputs: Altus Group Canadian Cost Guide 2025, Toronto base range; Statistics Canada Building Construction Price Index, table 18-10-0135-01

Next scheduled review: 2026-04-15

03Build the stack

Your build

All-in cost — Office (low-rise), Barrie

$31,223,748

$520/sf · band $24,603,872$39,738,443

At this specification the office (low-rise) prices at about $520 per square foot all-in, with a 48% spread between the low and high band. Hard cost is 75% of the total and everything above it is soft cost, charges, contingency and escalation.

Cost stack by line
LineAmount$/sf
Substructure and foundations$2,573,424$43/sf
Structure and frame$5,146,848$86/sf
Envelope, roofing and glazing$3,860,136$64/sf
Interior partitions and finishes$3,002,328$50/sf
Mechanical and plumbing$3,431,232$57/sf
Electrical and life safety$2,358,972$39/sf
General conditions and fee$1,072,260$18/sf
Site work and servicing$1,930,068$32/sf
Hard cost subtotal$23,375,268$390/sf
Design and consultants$1,683,019$28/sf
Permits, approvals and reviews$420,755$7/sf
Project management and testing$841,510$14/sf
Financing, insurance and legal$1,262,264$21/sf
Contingency (10%)$2,758,282$46/sf
Escalation to midpoint (12 mo)$882,650$15/sf
All-in cost$31,223,748$520/sf

How these figures were produced

  • ObservedRecorded directly from the cited source series, unadjusted.
  • ModelledDerived arithmetically from observed inputs using the published method; not a market quote.
How Buildlor computes these numbers

Carry this deal forward

Your numbers travel with the link

The deal is encoded in the URL, never stored. Open a sister utility and it arrives pre-filled.

Keep this deal under watch

Save the deal and Dealor re-runs it every month against current rates and your own dates — so you hear about a broken DSCR or a lapsing renewal before your lender does.

Dealor — soon

04What moves the number

Cost drivers for this type in Barrie

Glazing ratio

a fully glazed curtain wall can double envelope cost against a punched-window precast facade.

Floor plate efficiency

a small plate spreads core, elevator and stair cost across less rentable area.

Parking

structured or underground parking is a separate cost per stall and often exceeds the building rate per square foot.

Base building versus fit-out

the shell rate assumes no tenant partitions, so price the fit-out separately.

Barrie contractors travel from the GTA on larger packages, and mobilisation shows up as a general-conditions premium. That is why the same drawings priced in Barrie and in Toronto do not land at the same number even when the trades are the same.

On the preset build above, hard cost is $23,375,268 and everything after it — soft cost, charges, contingency and escalation — adds $7,848,480. Budgeting off a hard rate alone is the single most common way an early construction budget goes wrong.

Buildlor facts

  • Hard cost for a office (low-rise) in Barrie sits at $345 per square foot at standard specification.
  • Soft cost at 18% of hard adds $4,207,548 to the preset build.
  • ON construction escalation is running at 3.2% a year, or $882,650 over twelve months on this build.

05Related

Other types in Barrie

All markets →

06Questions

What does it cost to build a office (low-rise) in Barrie?

On the curated Barrie band, hard cost runs $276 to $432 per square foot for a office (low-rise) at standard specification. Adding site work, soft cost, charges, contingency and twelve months of escalation puts the all-in figure near $520 per square foot on a 60,000 sf preset. Your own area and specification change that number, which is what the builder above is for.

Why does Barrie price where it does?

Barrie contractors travel from the GTA on larger packages, and mobilisation shows up as a general-conditions premium. The published Toronto base range is scaled by a documented factor of 0.92 for this market, and the ON escalation series is running at 3.2 percent a year.

Is the development charge in this number?

No. We do not yet hold a charge row for Barrie. Enter the figure from the municipality's schedule in the builder.

What is excluded from every figure here?

Land, financing interest during construction beyond the soft-cost allowance, taxes recoverable as input credits, tenant furniture and equipment, and any remediation or off-site works. Those are separate line items in a real proforma.

07Sources

Sources

  1. [1] Altus Group Canadian Cost Guide 2025, Toronto base rangePublished Toronto range scaled by a documented city cost factor of 0.92. Hard cost only: excludes land, soft costs, development charges and contingency.
  2. [2] Statistics Canada Building Construction Price Index, table 18-10-0135-01Non-residential building construction, Toronto CMA.
How Buildlor computes these numbers

Not adviceBuildlor is a data publisher. We do not bid, price, estimate, or build work, and nothing here is a quote, a tender price, or construction advice. Figures are indicative order-of-magnitude benchmarks for early budgeting and must be confirmed by a qualified cost consultant, quantity surveyor, or general contractor before you rely on them. About Buildlor